OFFSHORE WIND MARINER UPDATE NO. 57

Conduit Installation

STATUS: Complete

MARPRO Marine with Northstar Marine Services will be installing conduit at Covell’s Beach in Hyannis for the onshore substation in preparation for cable laying operations for the Vineyard Wind 1 wind farm. The operations will utilize an anchored barge 1300’ off the beach in 14’ of water, 3 support vessels, a tug and a Scout vessel. Please remain 500 feet away from the location of the barge for the safety of the divers. Additionally, do not pass between the beach and vessels as there is risk of entanglement with silt curtains and equipment. The operations will run Monday through Saturday 7:00 AM to 7:00 PM weather permitting.

 
DATES(S): On or about December 12, 2021 until Mid-March 2022

LOCATION(S): Centerville Harbor, off Covell’s Beach, Town of Barnstable, MA

 

ALL VESSELS

On-Site Point of Contact: Mr. Sean Larson
Phone: (320) 333-8749

Standing by on VHF channel 13 & 16

MARPRO I

Flag: US
SIZE: 26

OYSTER BAY II

Flag: USA
Captain: Christian Zimny

NORTHSTAR 4

Flag: US
SIZE: 50’

R/V LOPHIUS

Captain: Ben Maher

 

COMPELETED

NORTHSTAR CRANE BARGE 140

Flag: US
SIZE: 140’ X 45’

NORTHSTAR INTEGRITY

Flag: US
SIZE: 80’

 

REALIST

Flag: US
SIZE: 86’

CHALLENGER

Flag: US
SIZE: 92’

NORTHSTAR INTERCEPTOR

Flag: US
SIZE: 47’

Tyrone

Flag: US
SIZE: 120’ x 35’

For the latest information, please contact:

Crista Bank, Fisheries Liaison, Cell: 508-525-0421 • Email: cbank@vineyardwind.com

Caela Howard, Fisheries Liaison, Cell: 508-386-9832 • Email: choward@vineyardwind.com

Jeannot Smith, Marine Liaison, Cell: 904-613-0134 • Email: jsmith@vineyardwind.com

archiveMoreschi