BOULDER RELOCATIONS (#71)
OFFSHORE WIND MARINER UPDATE NO. 71
STATUS: Complete
In August 2022 the OSV BERTO L MILLER conducted boulder relocation operations along the offshore export cable corridor through Nantucket Sound. The vessel lifted boulders off the bottom and placed them back on the bottom within our defined offshore export cable corridor during this operation. A total of 51 boulders were relocated.
Below are the shared locations of all boulders relocated during the boulder clearance efforts. The included Loran C. TD's are for reference only. For entry into a plotting system or onto a chart please use the latitude and longitude values, which are accurate to approximately 5 meters. If interested in more detailed information, contact Crista Bank.
VINEYARD WIND
Michael Clayton, Project Manager, Cell: 484-868-3747 • Email: mclayton@vineyardwind.com
Jen Cullen, Fisheries Liaison, Cell: 508-648-4184 • Email: jcullen@vineyardwind.com
VineyardWind.com • info@vineyardwind.com • 508-717-8964
O&M Building on MV 69 Beach Rd. Vineyard Haven, MA 02568740